Slope Stabilization and Rock Fall Prevention

Thornton Road Slope Stabilization

Project Details

The City will be completing slope stabilization in response erosion and intense stormwater runoff that occurred during an atmospheric river event in December 2025. The project will include a reinforced cast-in-place concrete retaining wall with micropiles and soil anchors at the base of the slope. Large rock armouring will be placed above the wall on a flatter slope for energy dissipation and erosion control. Road side drainage will be improved on both sides of Thornton Road that were affected by the rain event.

Timeline

Work is scheduled to take place between mid-October and December.

Traffic Management

Single-lane traffic will be maintained throughout the duration of the project. Residents and commuters may use Extrom Road to bypass construction activities.

Chilliwack Lake Rock Fall Prevention

Project Details

The City will be constructing a rockfall attenuator and a barrier to reduce the risk of rockfall on Chilliwack Lake Road.

Timeline

This project is scheduled to be completed in December.

Want to Learn More?

Do you have any questions about slope stabilization or rock fall prevention? Please contact the Engineering Department at 604-793-2907 or [email protected].

For email updates about transportation construction projects, subscribe to our e-newsletter.