Active Transportation Design Project

Project Details

The Active Transportation Design Project will provide design solutions to improve cycling facilities and road safety in a cost-effective manner. The project will include traffic signal, streetlighting, street parking and roadway designs as well as a vehicular movement analysis.


The project includes engineering detailed design services for the following locations:

  • Luckakuck Way (Vedder Road to the Valley Rail Trail) - safety improvements and signalization
  • Knight Road (Topaz Drive to Evans Road) - protected cycling facilities
  • Downtown Cycling Network
  • Knight Road at Southern Railway crossing upgrade to flashing lights, bells and gates system and civil works connecting to the Valley Rail Trail

Completed Works

  • Public engagement for the Downtown Cycling Network
  • 50% detailed design drawings for Luckakuck Way, Knight Road and Downtown Cycling Network
  • Engagement with Southern Railway Design Team to begin design works

Future Works

  • Engagement for Princess Avenue traffic flow changes
  • Completion of detailed design

Timeline

  • The design will be completed early fall 2023
Attachments
Description Date File Size 
Active Transportation Location Map 2023-08-16 768KB