Spadina Avenue (Ashwell to Corbould)

Construction Timeline:

  • Complete

Background:

This project incorporates the vision of a Neighbourhood Greenway as recommended in the Downtown Land Use and Development Plan (2010).  Neighbourhood greenways are enhanced pedestrian and bicycle connections linking key activity nodes and residential neighbourhoods.

  • Approximately 530m of road reconstruction
  • Paving
  • Drainage
  • Street trees
  • Streetlights
  • Curb
  • Sidewalks
  • Parking stalls
  • Grass boulevards

Frequently Asked Questions:

Project Details: 

PARKING
  • The reduction in available road parking will be 50 stalls, but the planned parking lot expansion adjacent to the Chilliwack Curling Club will add more total parking stalls than will be lost in this project.

DRIVEWAYS
  • If you are unable to turn left into your driveway because of the centre median, there will be three mid-block crossings through the median to permit u-turns.

PEDESTRIAN FACILITIES
  • Both sides of Spadina Avenue will be receiving new sidewalks as well as along the centre median.  Three new crosswalks will be installed.  A tree lined buffer between the sidewalk and the travel lane will enhance safety and comfort for pedestrians.

Take a look at our Spadina Avenue information booklet.

For monthly updates on transportation construction projects, subscribe to our e-newsletter.

Attachments
Description Date File Size 
Spadina Avenue (Ashwell Rd to Corbould St) FAQ July 2020 2020-07-09 135KB 
Spadina Avenue Information Booklet 2020-07-29 3.66MB