Previous Page  53 / 101 Next Page
Information
Show Menu
Previous Page 53 / 101 Next Page
Page Background

53

7. Upgrade the sewer system within the urban

corridor, especially in locations where noted

densification and population growth are an-

ticipated, including:

a. The downtown neighbourhoods;

b. Other core neighbourhoods along the

Yale Road-Vedder Road corridor;

c. New areas within the Urban Growth

Boundary designated for future

growth; and

d. The pressure points along the

Sardis-Vedder main trunk.

8. Plan for system upgrades for additional

water and sewer capacities in the Village

West industrial district to support future

industrial growth and densification.

9. Maintain a regular dialogue with First Nations

on future growth and development, and

opportunities for collaboration in infrastruc-

ture planning in order to ensure First Nations’

servicing needs will be met in a cost-effective

and timely manner.

10. Continue to implement the sewerage treat-

ment plant expansion plan and closely mon-

itor future population growth and threshold

attainment.

11. Adopt the best and cost-effective sewage

treatment technology to:

a. Ensure meeting provincial and federal

standards regarding treated effluent

at the Fraser River outfall as the City’s

population and economy grow.

b. Reduce GHG emmission; and

c. Explore co-generation opportunities

at the existing plant.

12. Support the requirement that industry

generating a substantial demand for sewer

capacity and/or requiring special processing,

treat their effluent on site before discharging

it into the municipal system.

13. As the hillside community development

proceeds, consider a detailed storm drainage

plan to:

a. Evaluate its post development impact

on the rural valley floor storm drain-

age system;

b. Confirm and implement the required

system upgrades attributed to hillside

development;

c. Re-evaluate the Master Drainage Plan

and re-establish future improvement

priorities, including channel capac-

ities, network efficiency and main

pumping station upgrades.

d. Expand the storm drainage data base

such that both large and small/fre-

quent storm events are represented.

14. Develop a comprehensive storm drainage

upgrade plan for the downtown centre and

neighbourhoods to ensure their system ca-

pacity and performance are adequate for all

storm events.

15. Upgrade storm drainage facilities to improve

fish passage and aquatic habitats.

16. Adopt best practices in drainage design and

management to address both infrequent

main storm and frequent smaller storm

events.

SAFETY AND SECURITY

Public safety and security are fundamental to healthy

community development. In the context of physical

planning, public safety focuses on hazard avoidance

or management, especially the flood risks of major

rivers, excessive or unstable slopes, water channels

and debris flows. This subsection concentrates on the

flood risks and policies in light of their broad impact

on our City, whereas the development permit guide-

Goal 5 - Build Healthy Attractive Communities