valley floor to the Fraser River. The Eastern Hillsides

Comprehensive Area Plan has assessed that aspect of

hillside development impact, and Promontory devel-

opment, which is near build out, has also prompted

detailed analysis of the same phenomenon. These

concerns have led the City to embrace, where prac-

tical, new storm drainage/watershed management

practices, as well as adaptations to all storm events.

Within the built-up area, the older downtown storm

drainage installations represent another critical focus

of future utility planning. Their condition is a subject

of analysis for long term growth because of the lower

elevation of the Chilliwack proper core, the frequency

of main storm events , and the expectation of signifi-

cant development investment and population growth

in the future (Map 16).

In summary, utility planning in Chilliwack is a pillar to

Chilliwack’s future growth and healthy community

development. Although the City has been success-

ful in managing its water, sewer and storm drainage

systems, future challenges are less concerned about

territorial expansion, but more with systemic changes

and innovative practices in management, design and

on-site capacity increase for densification demand.

OBJECTIVES

1. Protect public health and safety by providing

clean water, and a healthy, safe living environ-

ment.

2. Secure long term water supply sources.

3. Provide community water service to the en-

tire municipality where cost and demand

warrant.

4. Plan for the increased utility demand in areas

where densification and growth are promot-

ed.

5. Ensure the future utility systems meet the

provincial environmental requirements and

conservation objectives.

6. Adapt to future system and environmental

challenges through innovative and best prac-

tices

POLICIES

1. Protect theSardis-VedderAquifer throughpub-

lic education, Development Permit guidelines,

Zoning Regulation, the subdivision approval

process, and available provincial legislation.

2. Monitor the ongoing water consump-

tion rate, land development, densifica-

tion and population growth in relation to

the capacity of the Sardis-Vedder Aquifer.

3. Secure new sources of community water sup-

ply, and in particular, dedicate adequate re-

sources to developing Chilliwack Aquifer as an

additional water source in a timely fashion.

4. Promote and expand the current conservation

program in a comprehensive, integrated man-

ner, including:

• Sprinkler restriction in the dry season;

• Home fixtures and outdoor rainwater

capture for water conservation;

• Conservation measures for industrial,

commercial and institutional uses; and

• Water conservation in agricultural prac-

tices, and the use of ground water in a re-

sponsible manner.

5. Maintain ongoing consultation with rural

communities, including Yarrow, Rosedale,

Ryder Lake, Greendale and the unser-

viced farming households in the west on

opportunities for new community water

service or system improvements, self-fi-

nancing and senior government funding.

6. Align the sewer district boundaries with the

designated urban growth areas and the Urban

Growth Boundary, and support no new sew-

er demand outside these boundaries – with

the exceptions of the Eastern Hillsides, Prom-

ontory and Chilliwack Mountain hillside com-

munities whose development and servicing

are governed by their respective area plans.

Goal 5 - Build Healthy Attractive Communities