13.

During construction and/or development:

a.

All equipment not in use shall have

oil drip pans under the equipment to

prevent contamination;

b.

Equipment refueling shall be performed

in a controlled and secured location

and every effort taken to prevent fuel

spillage; and

c.

Spill containment and cleanupequipment

and material shall be available on site.

This cleanup material must include, at a

minimum:

• adequate quantities of sand for containment

on paved or impervious surfaces

• adequate quantities of absorbent pads

or material to cleanup hazardous spills

(capable of absorbing 100% of the Hazardous

Materials)

14.

The operator of a facility handling or storing

Hazardous Materials exceeding a volume of

200 litres shall have a Best Management Plan

(BMP) prepared by a Qualified Environmental

ProfessionalThe certified BMP shall address

the handling, storage and disposal of

Hazardous Materials, and include provisions

for strict inventory controls.

15.

The operator of a facility handling or storing

Hazardous Materials exceeding a volume

of 200 litres shall have a Spill Response

Plan prepared by a Qualified Environmental

Professional, and forward one copy to the

City’s Engineer. The certified Spill Response

Plan shall address measures that should

be taken at the site in the event of a spill or

accident.

16.

No underground storage tanks shall be

permitted for storing petroleum products.

Aboveground storage tanks used for the

purpose of containing petroleum products

within the Total Capture Zone shall be smaller

than 800 liters in size and meet or exceed

the Environmental Code of Practice for

Aboveground and Underground Storage Tank

Systems Containing Petroleum and Allied

Petroleum Products (2003 or latest version)

and the British Columbia Fire Code (2006 or

latest version).

17.

Without limitation to Section 16, aboveground

petroleum product storage tanks (ASTs) within

the Total Capture Zone shall be constructed to

include the following:

a.

Double-walled steel tank construction;

b.

Secondary containment of piping;

c.

Tanks coated with rust-resistant material;

d.

Overfill protection device;

e.

Spill containment device around fill pipe;

f.

A dispenser sump and tank sump, for

the control of possible leakage from the

dispenser or piping; and

g.

Leak detection of the interstitial space,

piping and sump(s).

18.

Installation of aboveground petroleum

product storage tanks shall be conducted

by a licensed qualified contractor under the

supervision of a Professional Engineer.

19.

Every storage tank shall be tested for leakage,

following procedures outlined in the Fire Code

of British Columbia before putting a new tank

into service.

20.

Installation of new private wells regardless

of purpose is prohibited unless approved by

the City. Approvals shall only be considered

for properties not serviced by the municipal

system. Owners that have a new private water

supply well installed shall provide the City with

a copy of the well installation record within 30

days of installation.

21.

Subsurface geothermal systems including the

installation of wells are prohibited.

22.

New buildings shall be connected to the