surface or are within 2 metres of the highest

recorded water table elevation from June 1st

to October 1st must:

a.

be water proof. Water proofing of the

structure must utilize materials that will

not impact groundwater quality and be

approved by the Engineer;

b.

have an internal design that minimizes

potential cracking of the foundation

and includes treatment of cold joints to

create a complete separation between

the structure and the Aquifer;

c.

be constructed with a monitored drain-

age system for water volumes and

hydrocarbons to detect all upsets;

d.

not adversely impact groundwater flow

patterns; and

e.

include an internal drainage system that

discharges drainage from below grade

structures to a sanitary sewer line.

4.

All storm water, with the exception of

residential foundation drains, shall be

conveyed off-site to municipal storm sewers.

5.

Stormwaterfromroadwaysanddrivewaysshall

not be discharged directly to ground by means

of exfiltration systems or rock pits within the

60-DayCaptureZone, asdelineatedonMap1A.

6.

Drainage from subsurface structures and

parking lot facilities, with the exception

of residential roof and foundation drains,

shall be controlled using a closed system,

which includes oil and grit separators

conveyed off-site to a municipal storm sewer.

7.

Where a municipal storm sewer system is not

available, drainage from subsurface structures

and parking lot facilities shall be conveyed to

outside of the 60-Day Capture Zone (shown

on Map 1A) to a triple chamber treatment

facility, which must include, but is not limited

to, an oil and grit separator and a gate valve

before the infiltration chamber to contain

spills.

8.

On-site treatment facilities shall be designed

by a Qualified Environmental Professional and

must ensure the discharged water will not

degrade the quality of the aquifer.

9.

Commercial, industrial and parking facilities,

having areas that are not paved or completed

with buildings, shall be covered with low

permeability material to reduce infiltration.

A soil liner consisting of 0.60 metres of fine-

textured soil (clay or clay-loam) constructed

beneath Topsoil is an acceptable alternative.

10.

All Hazardous Materials, which are handled,

and/or stored, shall be minimized and subject

to secondary containment utilizing non-

permeable construction material, which may

consist of a concrete pad and sidewalls to

contain the substances should a spill or leak

occur. The storage area shall be covered and

secured against vandalism. The capacity of

secondary containment shall equal at least

the maximum volume of the stored material,

plus 10%. Secondary containment systems for

volumes of hazardous material greater than

200 litres shall be inspected by a Qualified

Environmental Professional.

11.

No underground storage tanks for Hazardous

Materials shall be permitted. Above ground

storage tanks for Hazardous Materials shall

conform to requirements set out in this

guideline for Petroleum Storage Tanks.

12.

Temporary storage of Hazardous Materials

during development and/or construction

shall:

a.

Utilize secondary containment;

b.

Be covered and secured against

vandalism; and

c.

Be protected from damage due to

construction equipment and/or

construction activities.