Street Light Installation
          
        
        
          Luckakuck Way – Amber Drive to
        
        
          McDonald’s Restaurant.
        
        
          
            Traffic Signal Program
          
        
        
          Improvements were completed at 9
        
        
          locations including video detection,
        
        
          pedestrian count down timers and
        
        
          audible pedestrian signals.  This minor
        
        
          capital program brings much needed
        
        
          upgrades to the 50 traffic signals
        
        
          in Chilliwack.
        
        
          
            Bridge Reconstruction
          
        
        
          Repairs were done to several bridges
        
        
          including Chilliwack Central Rd. over
        
        
          Banford Ditch, Vedder Bridge, Eckert  St.
        
        
          over Stewart Creek, South Sumas Rd. over
        
        
          McGillivray Creek, Young Rd. over Hope
        
        
          Slough, Menzies St. over Hope Slough,
        
        
          Banford Rd. over Semiault Creek and
        
        
          Prest Rd. over Semiault Creek.
        
        
          
            Roadway Markings
          
        
        
          Centerlines, lane lines, stop bars and
        
        
          crosswalks were installed along 450km of
        
        
          road way within the City limits.
        
        
          
            Annual Traffic Counts
          
        
        
          Transtech Data Services completed the
        
        
          2013 Annual Traffic Count Program.  This
        
        
          program involved  counting 24hr two
        
        
          way volume counts at 87 locations and 71
        
        
          manual intersection counts.  Information
        
        
          is available in the Engineering
        
        
          Department or the City’s website at
        
        
        
          This data assists with signal timing,
        
        
          infrastructure planning, and traffic
        
        
          control device evaluation.  It also assists
        
        
          with business planning, advertising and
        
        
          real estate evaluations.
        
        
          
            Prest Road Engineering
          
        
        
          
            Preliminary Design
          
        
        
          A proposed upgrade to Prest Road
        
        
          between Bailey Road and Chilliwack
        
        
          Central Road will increase capacity and
        
        
          safety for vehicles, pedestrians and
        
        
          cyclists.  A preliminary engineering
        
        
          design has recently been completed
        
        
          showing upgrades in a phased approach
        
        
          up to the year 2051. This includes
        
        
          intersection improvements and road
        
        
          widening to provide wider travel lanes
        
        
          and bicycle lanes in phase 1 and 2 with
        
        
          ultimately a 4-lane road in Phase 3 and 4
        
        
          (2030 and beyond).
        
        
          
            Auto Crime Prevention and
          
        
        
          
            Distracted Driving
          
        
        
          
        
        
          
        
        
          Auto Crime Prevention awareness
        
        
          had information on the top 10
        
        
          stolen vehicles in BC along with
        
        
          safety tips and reminders.
        
        
          
        
        
          
        
        
          Distracted Driving and its effects
        
        
          were showcased with driver tips
        
        
          and descriptors of violations.
        
        
          
            Commercial Vehicle Inspections
          
        
        
          Safer City partnered with representatives
        
        
          from the Ministry of Transportation
        
        
          Commercial Vehicle Safety and
        
        
          Enforcement Branch and Chilliwack
        
        
          RCMP Traffic Services to check vehicles to
        
        
          confirm their compliance with applicable
        
        
          safety legislation at locations within
        
        
          the City.
        
        
          
            Eastern Hillsides Balancing
          
        
        
          
            Reservoir
          
        
        
          The reservoir will provide sufficient
        
        
          volume and elevation to maintain
        
        
          pressure throughout the peak water
        
        
          demand periods and ensure
        
        
          system reliability.
        
        
          
            McGrath RoadWater Main
          
        
        
          
            at CN Rail
          
        
        
          A sink hole appeared in and around CN
        
        
          Rail tracks on McGrath Road. After field
        
        
          investigations, it was revealed that the
        
        
          condition of existing 150mm diameter
        
        
          steel water main underneath CN Rail had
        
        
          deteriorated and was replaced to protect
        
        
          the CN Rail line and to provide reliable
        
        
          water supply.
        
        
          
            Patten Avenue Sewer Main
          
        
        
          
            Replacement
          
        
        
          Installation of  45m of 200mm diameter
        
        
          PVC sanitary sewer main along with
        
        
          service connections to replace the
        
        
          existing 150mm diameter vitrified clay
        
        
          sewer pipes.
        
        
          
            Wing Dyke Realignment
          
        
        
          Realignment of a section of the Wing
        
        
          Dyke on Island 22 to set it back from the
        
        
          eroding bank line.
        
        
          
            Fraser River Freshet
          
        
        
          The Fraser River peaked much earlier
        
        
          than normal in 2013 due to an extended
        
        
          hot spell in early May. Water levels
        
        
          reached a peak of 5.6 metres at the
        
        
          Mission Gauge during the week of May
        
        
          13 – 19, which is almost 3 metres higher
        
        
          than the historical average water level for
        
        
          that time of year.
        
        
          
            Road Safety Day
          
        
        
          Crowds enjoyed displays and
        
        
          conversations with the Safer City team
        
        
          who provided information on
        
        
          safety programs.
        
        
          
            Bailey Landfill Annual Report
          
        
        
          The Bailey Landfill Annual Report
        
        
          was submitted as a condition of our
        
        
          Operational Certificate with the Ministry
        
        
          of Environment .  The report includes
        
        
          review, analysis and comparison of the
        
        
          water quality results from the monitoring
        
        
          program with applicable water
        
        
          quality standards.
        
        
          
            Bailey Landfill Design-
          
        
        
          
            Build Project
          
        
        
          Construction has progressed at the Bailey
        
        
          Landfill to construct a new landfill cell, a
        
        
          landfill gas extraction system, and new
        
        
          pump station. Works completed to date
        
        
          include the placement of gravel, clay, and
        
        
          geomembrane for the new Northwest
        
        
          Expansion Cell. The drilling of gas
        
        
          extraction wells is in progress.
        
        
          
            Environmental Services
          
        
        
          
            Annual Programs
          
        
        
          
        
        
          
        
        
          Shred-a-Thon
        
        
          
        
        
          
        
        
          Bike to Work Challenge
        
        
          
        
        
          
        
        
          Community Clean-ups
        
        
          
        
        
          
        
        
          Adopt-a-Road / Adopt-a-River
        
        
          
        
        
          
        
        
          Pitch In
        
        
          
        
        
          
        
        
          Scrap Metal Recycling
        
        
          
        
        
          
        
        
          Semi-Annual City-Wide Garage
        
        
          Sale
        
        
          
        
        
          
        
        
          River and Vedder Mountain
        
        
          Cleanups
        
        
          
            NestleWaters Canada Street
          
        
        
          
            Furniture Donation
          
        
        
          Nestle Waters Canada donated over
        
        
          $20,000 to place 12 new garbage/
        
        
          recycling containers in the downtown
        
        
          area, as well as two street-side benches.
        
        
          Engineering Department
        
        
          11
        
        
          2013 Annual Report