Annual Report 2019 21 TRANSPORTATION & DRAINAGE Lickman Interchange Project ƒ Improvements include an additional northbound and southbound lane and construction of a two lane roundabout at the Yale Rd./Luckakuck Way intersection ƒ Extension of the northbound left turn lane on the suspended portion over Highway 1 ƒ Bike lanes in both directions on Lickman Rd. Valley Rail Trail South Enhancement ƒ Lighting, fencing and visibility enhancements were installed along the existing section of the trail between Knight Rd. and Luckakuck Way Hack Brown/Prest Rd./Five Corners Design-Build Project ƒ Detailed designs were advanced on all projects including design coordination with BC Hydro/ Telus for pole relocations at the Prest Rd. and Chilliwack Central roundabout location ƒ The Prest Rd. roundabout construction began, which includes road widening, culvert installation and drainage works Webster Sidewalk Installation ƒ New sidewalk and drainage works were completed along Webster Rd. from Keith Wilson Rd. south ƒ Installation of streelights scheduled for the first quarter of 2020 Road Improvements - Asphalt ƒ Approximately 9.49 km of roadways were re- paved on the following: Banford Rd., Castleman Rd., Elk View Rd., Evans Rd., Extrom Rd., Matheson Rd. and Old Orchard Rd. Delineators ƒ Roadway delineators were installed to increase safety in the following areas; UTILITIES Mechanical Systems Replacement Project Upgrades to four sanitary pump stations (SPS) and one pressure reducing valve (PRV). ƒ SPS 5, 6 and 7 replacements; • required to increase pump station capacity to meet future flow conditions ƒ The SPS 10 upgrade; • required to meet future flow conditions and to improve operational reliability ƒ Upgrade to the Goldspring PRV; • required to meet current WorkSafe BC confined space regulations efficiently and to replace infrastructure that has reached the end of its serviceable life 2019 Utilities Upgrade Project ƒ 6 watermain installations ƒ 2 sewer main upgrades ƒ 1 storm sewer main upgrade ƒ 1 PRV installation ƒ Landfill gas collection system Wastewater Treatment Plant Inlet Works Upgrade Project ƒ The new inlet works will be able to manage flows projected for the next 30 years and beyond. The project includes a new inlet works building to house the new treatment system and includes the following efficient high-performance processing systems: • fine screening; • screenings washing, compaction and conveyance; • induced vortex grit removal; • grit washing and dewatering; and • space for a future trucked septage receiving and screening station • Watson Elementary • Vedder Road north of Keith Wilson Road • Young Road north and south of Hocking Ave. • Southlands Drive • Spadina Avenue • Ashwell Road • Hope River Road • McSween Road • Promontory Road. at Uplands Road

RkJQdWJsaXNoZXIy ODc2MA==