2013-04: Engineering Department Fourth Quarter Report
Download Fourth Quarter Report
- Introduction
- Eastern Hillsides Balancing Reservoir
- McGrath Road Water Main at CN Rail
- Sunset Drive Water Main Upgrade
- McConnell to Standeven Water Main Upgrade
- Biological Treatment System Expansion
- South Truck Sewer Upgrade
- Commercial Vehicle Check
- Car Seat Check
- Impaired Driving
- Downtown Painting
- New Crosswalk Installations
- Mill Street Project Update
- 2013 Asphalt Rehabilitation and Shoulder Paving
- Vedder at Thomas - Traffic Signal Upgrading
- Traffic Detection Video Transmission
- 2014 Snowpack Report
- Bailey Landfill Design-Build Project
- Bailey Landfill - East Cell Mitigation
- Household Hazardous Waste Day
- Waste Reduction Month
- Christmas Shred-A-Thon
- Site Renovations at Parr Road Green Depot
Attachments | |||
Description | Date | File Size | |
![]() |
2013 Fourth Quarter Report | 2014-02-06 | 4.16MB |