Engineering Department Quarterly Reports

Attachments
Description Date File Size
2018 - 01 - First Quarter Report 2018-05-01 4.10MB
2017 - 04 - Fourth Quarter Report 2018-02-07 3.70MB
2017 - 03 - Third Quarter Report 2017-11-07 5.10MB

2014-03: Engineering Department Third Quarter Report

McConnell to Standeven Water Main Upgrade, Sunset Drive Water Main Upgrade, South Trunk Sewer Upgrade Phase 3, Biological Treatment System Expansion Phase 1, Weeden Drive Booster Pump Station, Commercial Vehicle Inspections, Roundabout Open House, Network Screening Study, 2012-2016 Bridge Inspection Program, Tyson Road Roundabouts Project Update, Bailey Sanitary Force Main Upgrade - Storm Sewer Phase 1, 2014 Asphalt Rehabilitation and Shoulder Paving, Transit, Thornton Road Reconstruction, Vedder Road Pedestrian Signals, Traffic Signal Upgrades, Concrete Works, River Clean Up Events, Tzeachten Open House, Bailey Landfill Maintenance, 2014 Vedder River Sediment Removals, Fall City-Wide Garage Sale

2013-04: Engineering Department Fourth Quarter Report

Introduction, Eastern Hillsides Balancing Reservoir, McGrath Road Water Main at CN Rail, Sunset Drive Water Main Upgrade, McConnell to Standeven Water Main Upgrade, Biological Treatment System Expansion, South Truck Sewer Upgrade, Commercial Vehicle Check, Car Seat Check, Impaired Driving, Downtown Painting, New Crosswalk Installations, Mill Street Project Update, 2013 Asphalt Rehabilitation and Shoulder Paving, Vedder at Thomas - Traffic Signal Upgrading, Traffic Detection Video Transmission, 2014 Snowpack Report, Bailey Landfill Design-Build Project, Bailey Landfill - East Cell Mitigation, Household Hazardous Waste Day, Waste Reduction Month, Christmas Shred-A-Thon, Site Renovations at Parr Road Green Depot

2014-01: Engineering Department First Quarter Report

Eastern Hillsides Balancing Reservoir, McConnell to Standeven Water Main Upgrade, Sunset Drive Water Main Upgrade, 2014 North Chilliwack Water Main Upgrade, Biological Treatment System Expansion, South Trunk Sewer Upgrade Phase 3, Mill Street Project Update, Tyson Road Roundabouts, Concrete Program, Roadweay Reflectors, 2014 Asphalt Rehabilitation and Shoulder Paving, Thornton Road Fill Failure, Traffic Signal Emergency Pre-Emption, Bicycle Transportation Plan Update, Radar Vehicle Data System,Roundabout Open House, Distracted Driving Project, Bailey Landfill Design-Build Project, Modernizing Parr Road Green Depot, Curbside Collection Program - Christmas Tree Composting, Community Clean-up, Flood Protection, Vedder River Gravel Management, Wing Dyke Realignment

2014-02: Engineering Department Second Quarter Report

McConnell to Standeven Water Main Upgrade, Sunset Drive Water Main Upgrade, Biological Treatment System Expansion Phase 1, 2012 North Chilliwack Water Main Upgrade, South Trunk Sewer Upgrade Phase 3, Tyson road Roundabouts Project Update, Mill Street Reconstruction, Bailey Sanitary force Main Upgrade - Storm Sewer Phase 1, Public Engagement Events, Safer School Travel Program, 2014 Asphalt Rehabilitation and Shoulder Paving, Thornton Road Reconstruction, Roadway Markings, Vedder Road Pedestrian Signals and Traffic Signal Upgrades, Concrete Works, Earth Month, Community Clean-Ups: Over 30 Tonnes of Waste Collected by Volunteers, Scrap Metal Recycling: 34 tonnes of metal diverted, Semi-Annual City-Wide Garage Sale, School Workshops: Educating the Youth!, Stream-side Restoration, Shred-A-Thon and Food Drive, Invasive Japanese Knotweed Management, Green Commuter Challenge, 2014 Fraser River Freshet, Collinson Pump Station Upgrade, Old Orchard Road Sheet Piles and Road Repair

2014-04: Engineering Department Fourth Quarter Report

McConnell to Standeven Water Main Upgrade, Annis Road Pump Station Upgrade, Weeden Drive Booster Pump Station, Ford-Nevin Water Main Installation, Biological Treatment System Expansion Phase 1, Digester Gas Boiler Installation, 2014 Culvert Inspection Program, Prest Road Roundabouts Project Update, Vedder Bridge Replacement, Fraser Valley Express (FVX), Transit Bay Paving, Transit Shelter Expansion, Vedder at Keith Wilson - Eastbound Left-Turn Signal, Luckakuck at Mall access - Pole Replacement and Load Reduction, Thornton Slide, Trans-Canada Highway Signage, Sardis Rail Trail, 2015 Staff Retreat, Back to School, School Zone Signage, Kindness Crew, Household Hazardous Waste Day, Shred-a-Thon, Waste Reduction Month, Pumpkin Composting, Collinson Pump Station, Snowpack Report

2015-01: Engineering Department First Quarter Report

McConnell to Standeven Water Main Upgrade, Annis Road and Weeden Drive Pump Station Upgrades, Ford-Nevin Water Main Installation, Camp River Road Water Main Installation, Biological Treatment System Expansion Phase 1, Digester Gas Boiler Installation, 2015 Asphalt Rehabilitation and Shoulder Paving, Young Road CN Rail Crossing Improvement, 2015 Shoulder Paving, Roadway Reflectors, Roadway Markings, Hope River Trail, Message Board, Yale / Vedder / Kerr Intersection Improvement Project, Curbside Collection Program - Christmas Tree Composting, Habitat Enhancement, March 28 Clean-Up: Gill Bar Area, Fraser River Clean-Ups, Bailey Landfill Leachate Control Project, Bailey Landfill Gas Collection System, Collinson Pump Station Upgrade Project, 2015 Snowpack Report

2015-02: Engineering Department Second Quarter Report

McConnell to Standeven Water Main Upgrade, Annis Road and Weeden Drive Pump Station Upgrades, Digester Gas Boiler Installation, Ford-Nevin Water Main Installation, Camp River Road Water Main Installation, Biological Treatment System Expansion Phase 1, 2015 Asphalt Rehabilitation and Shoulder Paving, Chilliwack Transit - Rider's Guide Signs, FVX Transit, Crosswalk Installations, Road Safety Day, Roundabout Open House, Commercial Vehicle Inspections, Vedder Bridge Replacement, 2015 Design-Build Combination Project (Prest, Promontory, Bailey), Chilliwack Signs, Improvements to Portage Avenue, Improvements to Camp River Road, Earth Month, City Facilities Waste Diversion Review 2015, Browne Creek Wetlands, European Fire Ant Information Session, Protect Our Drinking Water Signs, Storm Drain Marking, Green Commuter Challenge, Collinson Pump Station Upgrade Project, East Dyke (Young Road) Upgrade Project, Fraser River Freshet

2015-03: Engineering Department Third Quarter Report

Annis Road and Weeden Drive Pump Station, Camp River Road Water Main Installation, Biological Treatment System Expansion Phase 1, Southlands Drive Water Main Upgrade, Chilliwack Mountain Zone 2 Pressure Reducing Valve (PRV Station Upgrade, Well #5 Testing, Vedder Bridge Replacement, Prest Road Roundabouts, Vedder Road South Pre-Design, Concrete Works, Roadway Markings, Back to School, Hey Neighbour, Slow Down, Yale / Vedder / Kerr, 2015 Asphalt Rehabilitation and Shoulder Paving, Bailey Road Japanese Knotweed Control, Road Base Reinforcement, Transit Shelter Installation, Crosswalk Installation, Traffic Signal Improvements, Bailey Landfill Financial Plan Update, Adopt a River Clean Up Event, Residential Curbside Organic Waste Program, Tzeachten Open House, Adopt a Road and Adopt a River Program Update, Fall City-Wide Garage Sale, Collinson Pump Station Upgrade Project, East Dyke (Young Road) Upgrade Project

2015-04: Engineering Department Fourth Quarter Report

Annis Road and Weeden Drive Pump Station Upgrades, Camp River Road Water Main Installation, Wastewater Treatment Plant Inlet Works Upgrade, Marble Hill Well Source Development, Biological Treatment System Expansion Phase 1, Vedder Bridge Replacement, Prest Road Roundabouts, Asphalt Rehabilitation and Shoulder Paving, Corbould at Lewis - Multi-Way Stop Installation, Traffic Management, School Zone and Playground Zone Reflective Panels, Concrete Works Design, Annual Traffic Count Program, Household Hazardous Waste Day, Waste Reduction Month, Shred-a-Thon, Pumpkin Composting, Green Christmas, Residential Curbside Organic Waste Program, Collinson Pump Station Upgrade Project, East Dyke (Young Road) Upgrade Project

2016-01: Engineering Department First Quarter Report

2016 first quarter report. Engineering is responsible for water and sewer, transportation and environmental services.

2016-02: Engineering Department Second Quarter Report

Annis Road and Weeden Drive Pump Station Upgrades, 2016 Utilities Project, 2016 Water and Sewer Combo Project, 2016 Asphalt Rehabilitation and Shoulder Paving, Road Base Reinforcement, Traffic Signal Video Detection, Live Traffic Data, Safer School Travel, Training, Sheffield Way, Roadway Markings, Concrete Wheelchair Ramps, Prest Road Roundabouts, Vedder Bridge Replacement Design-Build Project, Public Engagement, Earth Month, Green Commuter Challenge, Shred-A-Thon and Food Drive, Fraser River Freshet, Town Dyke Preliminary Design